RBL technical planning for BVG

Electromobility
Operational support
Procurement
Public transport
System implementation
Transport management and mobility

Project description

Berliner Verkehrsbetriebe (BVG) operates a computerised operations control system (RBL) to monitor and control operations and to generate real-time data to inform passengers about current transport services. The bus (BO) and tram (BS) operating branches are integrated into this RBL to varying degrees. After almost 20 years of operation, the existing systems are to be replaced by a product that is generally available on the market and will map both branches of operation in an overall system. Project components are the renewal of the central systems for monitoring, operational control and real-time data generation etc. and the equipping of the buses (approx. 1,950) and trams (approx. 500) with new on-board computer technology.

Service description

BLIC has been commissioned by BVG to provide support throughout the entire project, including

  • Project management
  • Implementation planning (specifications)
  • Preparation and monitoring of the award procedure
  • Project monitoring (specification phase, test operation, trial operation, acceptance procedures)
  • Change management, invoice monitoring

Your contact person

BLIC Sekretariat

T:+49 30 859540-99
E: postmaster@blic.de

Project period: 05.2023 until 12.2028